Buy lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog Products Online In India

lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog by Lynxking

Brand: Lynxking
USA Icon USA Store
Price
Regular price Rs. 4,889.00
Regular price Rs. 0.00 Sale price Rs. 4,889.00
Save Rs. -4,889
/
🚚 Usually gets delivered in 10 business days. Once the order is placed, it dispatches from USA facility.
  • In stock, ready to ship
  • Backordered, shipping soon
  • Free shipping all over India
  • Free & Easy Returns*
  • 100% Secure payments*

Discover the authentic lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog by Lynxking, part of our Training Leashes collection. Imported directly from the USA and sourced from trusted suppliers, this product is 100% authentic and delivered anywhere in India at the best price.

Highlights & Benefits

  • Original Training Leashes – lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog by Lynxking
  • 100% authentic and sourced from trusted suppliers
  • Imported from the USA with strict quality checks
  • Available at the best price in India
  • Fast and secure delivery across the country

Lynxking check cord dog lead is great for walking, exercising and training dogs.

It is made with Non-absorbent lightweight but strong material, has a comfortable double braided handle for your control.

Check cord long dog leash has 3/8 thickness and 10ft 15ft 30ft 50ft length, available in black blue orange red and black 5 colors.

 In order to make it easy for you to carry, we presented you an orange drawstring backpack bag, you can put check cord in the bag before and after use. The round climbing rope and 360 degree rotating clasp design long training leash will not sink and will not tangle in your backpack, It is perfect for training and exercises with your dog.
Specification:
Size: 3/8 * 50ft Color: orange


  • SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability
  • NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
  • LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won't get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.
  • SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.
  • SIZE: 3/8 (9.5 mm) in diam ,Size of this one is 50foot,color orange, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose
  • Item Dimensions: Width: 0.375 inches, Height: 0.1 inches, Length: 600 inches
  • Item Package Dimensions: Width: 14.2 centimeters, Height: 25 centimeters, Length: 5.2 centimeters

Attribute Value
included components leash
model name check cord
target species Dog
item package quantity 1
brand Lynxking
closure
is expiration dated product False
item type keyword pet-training-leads
size rope3/8x50'
warranty description 2 years
part number LL-1
style round rope lead
color Orange
pattern 3/8 inch * 50foot
item package weight 0.46
item length width
manufacturer Keenleader.,ltd.
number of boxes 1
model number LL-1
supplier declared dg hz regulation not_applicable
batteries required False
dog breed size small
product site launch date 7/20/2019 7:00:00 AM
target audience keyword dogs
material Polypropylene, Metal
unit count 1
batteries included False

Why Choose The Global Genie (TGG)?

At The Global Genie, we bring global products closer to you. Whether it’s Training Leashes like the lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog by Lynxking or any other international favorite, we guarantee authenticity, fair pricing, and doorstep delivery across India. Shop confidently knowing every product is carefully verified and backed by our trusted supplier network.

Now you can order lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog by Lynxking by from anywhere in India — including Delhi, Mumbai, Bangalore, Hyderabad, and Chennai — with fast doorstep delivery from TGG

TheGlobalGenie operates solely as a global cross-border e-commerce logistics provider. Our role is limited to facilitating the delivery of goods selected by you, as received from the original brand or its authorized distributors. We do not assume any responsibility for the quality, functionality, or any other issues related to the products you purchase through our platform. Our services are strictly limited to the transportation and delivery of your selected items. Any concerns regarding the product itself, including but not limited to defects, quality, or performance, must be addressed directly with the manufacturer or authorized distributor. TheGlobalGenie disclaims all liability in this regard.

This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.

Delivery Timeline: Orders are typically delivered within 10 to 12 days from the date of purchase.

Shipping Coverage: We only use premium courier services like Blue Dart Express And India Post(For non-serviceable pin codes in Blue Dart Express , which may take more than usual time to deliver).
So all the pin codes across India serviceable by Blue Dart Express  and India post are covered in our shipping
capability.  

Order Processing: Once an order is placed, it will be processed and shipped within the shortest possible time.

Customs & Duties: Any applicable customs duties or import fees will be the responsibility of the TheGlobalGenie.(YOU PAY WHAT YOU SEE).

Common Questions

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

You may also like

More from Lynxking

Recently viewed